Manufacturing

Simulation-Based Tool for Evaluation of Production Plan Feasibility in Aerospace Industry

Development of simulation-base tool for:
• comparison of plant configuration options,
• evaluation of production plan feasibility with existing or prospective production facilities,
• determining key equipment units that need to be modernized first.
Period: April 2017 – March 2018
Industry sector: Manufacturing
Client / Partner: United Rocket and Space Corporation (URSC)

Components Safety Stock Calculation Supported by Monte-Carlo Simulation for Kamaz

Calculation of replenishment planning attributes for automobile assembly parts at assembly line. Assessment of impact of planning inaccuracy to the required safety stock of assembly parts. Client – OJSC KAMAZ, the biggest Russian trucks manufacturer.
Period: November 2013 – May 2014
Industry sector: Manufacturing
Client / Partner: KAMAZ / BearingPoint